The test scenario goes like this -

Change a value in config -> A job will execute at midnight -> config change will be update in system -> Verify that new config value is reflected.

Now how to wait for 24 hours for result verification. Any strategy for this kind of test cases

Thanks

1
  • I'm confused. Is this a production system or a test system this all happens on? How much control do you have over the environment? – Kevin McKenzie Apr 25 '19 at 14:12
3

Have the developers provide you with a way of triggering the scheduled task outside of its normal time slot.

Where I currently work this is provided as a webpage that has all of the possible scheduled tasks for a service, with buttons to trigger each one manually.

We use this page during our automated tests, and then observe the result.

We also do a manual check to make sure that the job itself has been scheduled correctly, e.g. it runs at midnight without being manually triggered.

1

I recommend the following approach:

  • Find the code that performs the overnight update.

  • Make sure it has good test coverage.

  • For the code that depends on it, replace the actual calls with mock responses.

  • For production ensure you have monitoring on the dependent service

0

When there is no way to trigger the job yourself like its proposed in https://sqa.stackexchange.com/a/38880/35888 you would need some kind of persistent memory. I could imaging a test making the change in the config and writing what was changed in a database (or plain file). A second test would read the database and only perform the necessary checks if there is an entry and enough time has passed

Though this feels like a dumb workaround and not like the "right" way to do it.