You are getting a build for testing with three modules, but the second module is in the development phase. So what do you do when you need to test the third module, which is dependent on the first and second modules?
For example, getting a build with the student, student mark and student result modules in which the student mark module is pending from the developer side. I need to test student result module but it depends on the student and student marks modules.
What should I do in that situation?